Wahaca
One site, located on the 1st floor of a popular shopping center, had…
One site was having issues with blocked drainage and subsequent flooding of the restaurant. The blockage was caused by shingle, indicating that there was a break in the line, somewhere underground. After inspection of the system with CCTV camera equipment, the defect was found to be a poorly made connection during the restaurant fit out. The defective section was excavated and replaced, making good the existing flooring on completion.
Hot and Cold Water
Pumps
Drainage
Special Projects
Investigations
After demonstrating our capabilities with Five Guy’s drainage requirements, we were then awarded…