Wahaca
One site, located on the 1st floor of a popular shopping center, had…
Due to various components in the pump station serving one of their prestigious gyms, we were asked to quote to upgrade the station. Over a series of nights, all components were stripped out in stages to allow the gym to operate each day. All the pumps, guide rails, guide assemblies and level controls were replaced, along with the control panel. This massive overhaul was undertaken without the gym having to close.
Reactive plumbing and drainage
Drainage PMV
Tanker and Pump PMV
CCTV investigations
Grease management compliance
Everything else!
After demonstrating our capabilities with Five Guy’s drainage requirements, we were then awarded…