Bankside
Website

Website
Length of working relationship
4 Years
Success Story
Following routine maintenance carried out on one of the hotel pump stations, a serious issue was found. The original configuration of pipework inside the pump chamber meant that when the one-way valves engaged, it caused serious strain on the outlet pipework which ultimately caused it to crack. The pump station was extracted and the existing pipework was stripped out and replaced. The line was reconfigured to ensure that there was no jarring from the one way valves and minimal stress on the pipework.
Services
Hot and Cold Water
Pumps
Drainage
Tanker
Special Projects 
Investigations
FUN FACT!
The Bankside Hotel is dog friendly! Your four legged friend even has access to a canine concierge to cater for all their furry needs!
Related
Four Seasons
The mechanical floats controlling the level in the pump station were found to…
 


