Four Seasons
The mechanical floats controlling the level in the pump station were found to…
We were engaged to undertake a full survey with remedial works of the hotel from the top floor to the basement. During the work we identified and replaced all lead pipework in the building for potable water services. The operation took nearly 12 months and was done in preparation for a massive refurbishment.
Reactive plumbing and drainage
Drainage PMV
Tanker and Pump PMV
CCTV investigations
Grease management compliance
Everything else!
The mechanical floats controlling the level in the pump station were found to…
Suffering from recurring pump failure, Flow-Right were engaged to overhaul the pump station….