Coworth Park
Website

Website
Length of working relationship
12 Years
Success Story
The site had a leak that was appearing on a wall of a. Following a CCTV investigation, the pitch fiber pipework was found to be in poor condition. Excavation was not an option so the defective line was repaired using no-dig technology, resin liners and robotic cutters.
Services
Hot and Cold Water
Pumps
Drainage
Tanker
Special Projects
Investigations
FUN FACT!
The hotel operates using sustainable energy from a biomass boiler, fuelled by willow trees that are grown on the estate.
Related
Four Seasons
The mechanical floats controlling the level in the pump station were found to…