Length of working relationship

10 Years

Success Story

A 2” pipe receiving waste from one of the hotel kitchens and was causing a leak in the loading bay below. Engineers were confused when tracing out the pipework but deduced that there must be a small void underneath the kitchen where the pipework ran. Blockwork was removed from a wall next to the kitchen, from which the pipework was accessed and repaired. A team then returned to make good the blockwork that was removed.

Services

Hot and Cold Water

Pumps

Drainage

Tanker

Special Projects 

Investigations

FUN FACT!

Me Hotel London is home to the popular Radio Rooftop Bar with stunning views over the River Thames and the London skyline. A great spot for a date night if you ask us!

Related

Four Seasons

The mechanical floats controlling the level in the pump station were found to…

VIEW CASE STUDY

Savoy

We were engaged to undertake a full survey with remedial works of the…

VIEW CASE STUDY

Would you like to explore commercial plumbing and drainage solutions for your business?

Contact us today.