Four Seasons
The mechanical floats controlling the level in the pump station were found to…
A 2” pipe receiving waste from one of the hotel kitchens and was causing a leak in the loading bay below. Engineers were confused when tracing out the pipework but deduced that there must be a small void underneath the kitchen where the pipework ran. Blockwork was removed from a wall next to the kitchen, from which the pipework was accessed and repaired. A team then returned to make good the blockwork that was removed.