Length of working relationship

21 Years

Success Story

Suffering from recurring pump failure, Flow-Right were engaged to overhaul the pump station. The station was converted from a wet well system to a dry well system with the pumps positioned outside of the existing 12000 litre tank. Independent outlet lines for each pump were installed as well as a dedicated extraction line for maintenance.

Services

Hot and Cold Water

Pumps

Drainage

Tanker

Special Projects 

Investigations

FUN FACT!

When it was built, approximately 40000 tonnes of earth was removed for the hotel basement.

Related

Four Seasons

The mechanical floats controlling the level in the pump station were found to…

VIEW CASE STUDY

Savoy

We were engaged to undertake a full survey with remedial works of the…

VIEW CASE STUDY

Would you like to explore commercial plumbing and drainage solutions for your business?

Contact us today.