Our clients
Rosewood
A 30m section of red ensign (cast iron) pipework was corroded and leaking in multiple places. The pipework ran through the ceiling of the hotel offices so replacement could only be undertaken overnight. Our specialist engineers removed the defective pipework and replaced it section by section over 2 nights.
Read MoreLangham
Flow-Right carried out the pre-survey works for the development of the new Spa facilities. A process often overlooked by some developers. Following the survey, we were also involved in the enabling works for the new facilities.
Read MoreRosa’s Thai
One site was having issues with blocked drainage and subsequent flooding of the restaurant. The blockage was caused by shingle, indicating that there was a break in the line, somewhere underground. After inspection of the system with CCTV camera equipment, the defect was found to be a poorly made connection during the restaurant fit out.…
Read MoreBankside
Following routine maintenance carried out on one of the hotel pump stations, a serious issue was found. The original configuration of pipework inside the pump chamber meant that when the one-way valves engaged, it caused serious strain on the outlet pipework which ultimately caused it to crack. The pump station was extracted and the existing…
Read MoreMe Hotel
A 2” pipe receiving waste from one of the hotel kitchens and was causing a leak in the loading bay below. Engineers were confused when tracing out the pipework but deduced that there must be a small void underneath the kitchen where the pipework ran. Blockwork was removed from a wall next to the kitchen,…
Read MoreCoworth Park
The site had a leak that was appearing on a wall of a. Following a CCTV investigation, the pitch fiber pipework was found to be in poor condition. Excavation was not an option so the defective line was repaired using no-dig technology, resin liners and robotic cutters.
Read More