Rosa’s Thai

One site was having issues with blocked drainage and subsequent flooding of the restaurant. The blockage was caused by shingle, indicating that there was a break in the line, somewhere underground. After inspection of the system with CCTV camera equipment, the defect was found to be a poorly made connection during the restaurant fit out.…

Read More

Third Space

Due to various components in the pump station serving one of their prestigious gyms, we were asked to quote to upgrade the station. Over a series of nights, all components were stripped out in stages to allow the gym to operate each day. All the pumps, guide rails, guide assemblies and level controls were replaced,…

Read More